Index of /userfiles/file/TechMemos
Parent Directory
00 EMT Guidance CD 091203.doc
READ FIRST Transmittal Letter.pdf
TM 0.0a Design Terms and Acronyms, R1 A.pdf
TM 0.1 15% Design Scope R1 080512 A.pdf
TM 0.3 CHSTP Basis of Design Report R1 071220 A.pdf
TM 0.5 Coordination With Caltrans R0 08.05.05 A.pdf
TM 0.7 Design Submittal Protocol R1 090708 A.pdf
TM 1.1.1 Codes Regs Standards Guidelines R0 090710 TM Excerp.pdf
TM 1.1.18 Design Variance Guidelines R0 080602 TM Excerpt A.pdf
TM 1.1.19 15% Capital Cost Method R0 090720 TM Excerpt A.pdf
TM 1.1.2 Design Life R0 090604 TM Excerpt A.pdf
TM 1.1.21 Directive Drawings 090707.pdf
TM 1.1.21 Typical Cross Section 15% R0 090404 TM Excerpt A.pdf
TM 1.1.4 Mapping and Surveys R0 080602 TM Excerpts A.pdf
TM 1.1.5 CHSTP CADD Guidelines R2 100309 A.pdf
TM 1.1.6 Align Stds for Shared Use Corridor LA to Anaheim R0.pdf
TM 1.1.8 Demarcation of Subdivisions and Milepost Numerics .pdf
TM 1.1.8 SubdivisionMilepostMap_080409.pdf
TM 2 1 2 Alignment Design Standards R0 090326 TM Excerpt A.pdf
TM 2.1.3 Turnouts and Station Tracks R0 090629 TM Excerpt A.pdf
TM 2.1.7 Intrusion Protection 081025 TM Excerpt A.pdf
TM 2.1.8 Turnouts and Yard Tracks R0 090717 TM Excerpt A.pdf
TM 2.10.4 Interim Seismic Criteria R0 090608 TM Excerpt A.pdf
TM 2.2.2 Station Program Design Guidelines R0 090219 Policy .pdf
TM 2.2.3 HST Passenger Station Site Des Guidelines R0 090410.pdf
TM 2.2.4 Directive Drawings 090729.pdf
TM 2.2.4 Station Platform Geometric Design R0 080516 TM Exce.pdf
TM 2.3.2 Structure Design Loads R0 090602 TM Excerpt A.pdf
TM 2.3.3 Directive Drawings 090707.pdf
TM 2.3.3 HST Aerial Structure R0 090602 TM Excerpt A.pdf
TM 2.4.2 Basic Tunnel Config R0 090730 A TM Excerpt.pdf
TM 2.4.2 Directive Drawings 090730.pdf
TM 2.6.7 Earthwork and Track Bed Design Guidelines R0 090723.pdf
TM 2.7.4 Utility Rqmts for 15 Percent Design R0 081120 TM Ex.pdf
TM 2.9.1 Geotech Investigation Guidelines R0 090522 TM Excer.pdf
TM 2.9.2 Geotech Reports Preparation Guidelines R0 090522 TM.pdf
TM 2.9.3 - Geologic &Seismic Hazard Analysis Guidelines 0906.pdf
TM 3.1.1.1 2x25kV Autotransformer System R1 090526 TM Excerp.pdf
TM 3.1.1.3 Directive Drawings 090707.pdf
TM 3.1.1.3 Traction Power Supply Sites R1 090603 TM Excerpt .pdf
TM 3.1.5.3 Utility Power Supply R0 090603 TM Excerpt A.pdf
TM 3.2.1 Directive Drawings 090707.pdf
TM 3.2.1 OCS Requirements R0 090714 TM Excerpt A.pdf
TM 3.2.3 Directive Drawings 090707.pdf
TM 3.2.3 Pantograph Clearance Envelopes R0 090807 TM Excerpt.pdf
TM 4.1 LOSSANConcOpsReport R2 080721 A.pdf
TM 4.1.1 Two Track Station Configuration LA to Ana R0 090710.pdf
TM 4.2 Phase 1 Service Plan R0 081120 A.pdf
TM 5.1 Directive Drawings 090722.pdf
TM 5.1 Terminal and HMF Guidelines R0 090825 TM Excerpt A.pdf
TM 5.2 Directive Drawings 090723.pdf
TM 5.3 Facilities Requirements Summary 090831 A.pdf
TM 6.1 Selected Train Technologies R0 08.05.30 A.pdf
favicon.ico
Apache/2.2.15 (CentOS) mod_ssl/2.2.15 0.9.8l DAV/2 mod_auth_passthrough/2.1 FrontPage/5.0.2.2635 Server at www.peninsularail.org Port 80